- Contact Person : Mr. Wang Frank
- Company Name : Shandong Hardy Bone Medical Technology Co., Ltd.
- Tel : 86-0531-67867809
- Fax : 86-0531-67867807
- Address : Shandong,Jinan,3F,Building 3,No. 21, Huaxin Road,Licheng District,Jinan City,Shandong Province,China
- Country/Region : China
- Zip : 250100
Medical Splint
Medical Splint
[Material]
Hardy Bone polyester splint is made of non-woven fabrics impregnated with water-activated polyurethane resin.
[Character & advantage]
1)Simple operation: Room temperature operation, short time, good molding feature
2) High hardness & light weight
20 times hard than plaster splint; light material and use less than plaster splint;
Its weight is plasters 1/5 and its width is plasters 1/3,which could reduce wound burden
3) lacunary (many holes structure) for excellent ventilation
Unique knitted net structure make sure good air ventilation and prevent skin damp and
hot & pruritus.
4) Rapid ossification (concretion)
It ossifies in 3-5 minutes after open the package and could bear weight after 20 minutes,
But plaster splint need 24 hours for full concretion
5) Excellent X-ray penetration
Good x-ray penetration ability makes X-ray photo clearly without remove the bandage, but
plaster bandage need remove to make x-ray inspection.
6) Good waterproofing quality
The moisture -absorbed percent is 85% less than plaster splint, Even the patient touch
the water situation, it still could keep dry in the injury position
7) Convenient operation & mold easily.
8) Comfortable & safe to patient/doctor
Material is friendly to operator and it wont become tension after concretion.
9) Wide application
10) Environment friendly
Material are environmental friendly, which could not produce polluted gas after
inflammation.
[How to use splint ]
1) Select proper specification according to the surgery position
2) Put the pad (cotton coil or cotton slipcover) on the surgery position.
3) Immerse the roll in room temperature water(21-24°C) for 4-6 seconds and squeeze it 2-3 times firmly. If the water warmer than 21-24°C shortens the immersing time, while cooler than 21-24°C water lengthens the time.
4) Take the splint out and press out excrescent water;Absorb water drip of the splint surface with towel.
5) Put the splint on the fixed position, molding it according to need. Mold it in 3-5 minutes after immersing in water because after that time it will concretion. Allow about 10 minutes for sufficient concretion and let patients not move during this time. It could bear electric weight after 20 minutes.
6) Fix the splint with gauze bandage or elastic bandage after concretion.
Item number | Size | Package | CBM & WEIGHT |
HSF312 | 7.5cm X 30cm | 20 pack X 6 box/ctn | 18.5KG & 0.1555CBM |
HSF335 | 7.5cm X 90cm | 10 pack X 6 box/ctn | 22.5KG & 0.1555CBM |
HSF415 | 10.0cm X 40cm | 20 pack X 6 box/ctn | 29KG & 0.1845CBM |
HSF430 | 10.0cm X 75cm | 10 pack X 6 box/ctn | 29KG & 0.1845CBM |
HSF530 | 12.5cm X 75cm | 10 pack X 6 box/ctn | 32.5KG & 0.1845CBM |
HSF545 | 12.5cm X 115cm | 5 pack X 6 box/ctn | 25KG & 0.1845CBM |
Medical Splint